r2 - 26 Feb 2008 - 01:58:08 - ZacSim?You are here: TWiki >  Main Web  >  ElixirRepertoireServer > SchedulerDesigner-QuartzMisfireInstructionsNotAccurate

Quartz Misfire Instructions Not Accurate

Our Scheduler Designer is using Quartz Scheduler (a 3rd party package).

An issue has been filed against the following scenario -

For example, suppose a trigger was scheduled to run 1 time per day, repeating 3 days. The original set up for repeat count is 3. If it ran once and the server went down. When the server was up again 5 days later, the existing repeat count should be 2 and the remaining repeat count is 0 (because it had missed all scheduled execution, according to the original repeat count).

In this case, even if a user chooses "Do not Fire" & "Do not Adjust" for the following in the wizard -

a) Should the trigger be fired immediately upon detection of misfire?

b) Should the repeat count be adjusted as if the trigger is not misfired?

Quartz still enforce the remaining repeat count (which is 0), and mark the trigger as 'completed'.

Read more on the issue raised here.

-- ZacSim? - 25 Feb 2008

Edit | Attach | Printable | Raw View | Backlinks: Web, All Webs | History: r2 < r1 | More topic actions
 
Powered by TWiki
This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback